Three Forks Voice - Connect With Your Community!

Wolves Update

 

November 4, 2020

Melissa Jenkins

It was Spooky Season on October 30 at Three Forks Elementary School.

TFS Campus Building Project Update

As most of our Three Forks families are aware, TFS did pass a building bond last spring. Since the passing of the bond, things have not slowed down. In collaboration with 45 Architecture and the District's Owner's Rep, Three Forks School District has been working through the schematic design phase of the project. This is an exciting process that requires a lot of work and conversations amongst all stakeholders. Throughout this process, the District has stood by the same 3 pillars (safety, infrastructure, and space) that have been the driving factor from t...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Our Family of Publications Includes:

Masthead 260x100
Lewis And Clark Journal

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2023

Rendered 06/02/2023 03:21